Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-media-category-management domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/nlmcc.net/htdocs/wp-includes/functions.php on line 6121
990 Pump Project - Nichols, Long & Moore Construction

990 Pump Project

New York State Department of Transportation Pump House Reconstruction and Rehabilitation located in Amherst, NY and Depew, NY.  The project consists of converting an existing 30 year structure from a Wet/Dry Well Pump House to a Wet Well only Pump Station.  The project required installin temporary bypass of the current pump station 36″ storm water intake, removal of equipment and concrete structures, construction of new Control Building with Electrical Controls, construction of new concrete, steel framing platforms with FRP access in the pump station and installation of a new 24″ Ductile Iron Discharge line with installation of three new 100 HP submersible pumps.  The project from shutdown to operation was completed in six months.