Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-migrate-db domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/nlmcc.net/htdocs/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-media-category-management domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/nlmcc.net/htdocs/wp-includes/functions.php on line 6121
Exchange Street Lift Bridge - Nichols, Long & Moore Construction
/

Exchange Street Lift Bridge

The New York State Department of Transportations’s 3.3 million dollar reconstruction of the Exchange Street Lift is located in Lockport, New York.  The work consisted of total reconstruction of the 100 year old lift bridge, which spans over the Erie Canal.  The work involved removing and replacing structural steel, mechanical lifting equipment, concrete abutments, and approach roadway.  The reconstruction work was preformed during the winter months when the cancal was drained.