Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-migrate-db domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/nlmcc.net/htdocs/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-media-category-management domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/nlmcc.net/htdocs/wp-includes/functions.php on line 6121
Griffith St. Bridge over Koy Creek - Nichols, Long & Moore Construction

Griffith St. Bridge over Koy Creek

Nichols, Long & Moore Construction Corp. was awarded a contract in April 2012 for $800K by Wyoming County Highway Dept for replacing an existing bridge over East Koy Creek in Town of Pike, NY. The existing concrete bridge spanning 60 feet over a trout stream will be removed and replaced with a precast concrete arch span. The highway will then be replaced with asphalt paving. The project is scheduled to start June 1 2012 and be complete by September 1, 2012.