Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-migrate-db domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/nlmcc.net/htdocs/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-media-category-management domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/nlmcc.net/htdocs/wp-includes/functions.php on line 6121
Pedestrian Bridge - Nichols, Long & Moore Construction
/

Pedestrian Bridge

The New York State Department of Transportation’s 3.5 million dollar Pedestrian Bridge included replacing the existing bridge with a new architectural structure.  The 350 foot bridge spans 10 lanes of traffic on a major expressway in Buffalo, NY.  The work was partially constructed at night.