Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-migrate-db domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/nlmcc.net/htdocs/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-media-category-management domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/nlmcc.net/htdocs/wp-includes/functions.php on line 6121
Specialty - Nichols, Long & Moore Construction
/

Specialty

    • Site Development – subdivisions, retail, industrial
    • Brownfield Development
    • Retention/Detention Ponds
    • Level C & D Environmental
    • Soil and Slope Stabilization
    • Underground Structures
    • Demolition, Excavation and Backfill
    • Canal Wall Replacement
    • Architectural Retaining Walls
    • Slope Protection Walls

Retaining Wall 

Constructed retaining wall on Route 42 in the Town of Cambria, Niagara County.

Overflow Retention Facility

Replaced liners in retention pond, installed mixers and pumps, and performed general paving at facility in Grand Island.